Peak Crossing
Site cleanup, prep for B premium sandstone retaining walls, drive way cut and fill leveling.
Project Date: 15 February, 2023
Client: Ian
About this Project
Removal of old gardens approximately 50 cubic meters of green waste, excavated approximately 300 cubic meters of soil, installed approximately 300 B Premium 400x400x1000mm, road base spread and compacted in prep for hex based gravel driveway, cut trenches for stormwater, Bio-cycle septic lines as well as power conduit. Augered pier holes for new concrete slabs as well as demolition and removal of old concrete pathways.